34.5 Megawatt Biomass Project Planned for Japan

- Sep­tem­ber 16, 2014, New Gen­er­a­tion Power

New Gen­er­a­tion Pow­er Inter­na­tion­al, a lead­ing glob­al renew­able ener­gy com­pa­ny, will devel­op three 11.5 Megawatt (MW) wood bio­mass plants in Japan.

Togeth­er, Chica­go-based New Gen­er­a­tion Pow­er Inter­na­tion­al (NGPI) and Nip­pon Ener­gy Solu­tion, Inc. (NES) will launch a new wood-based bio­mass ener­gy gen­er­a­tion ven­ture that will con­struct three sep­a­rate facil­i­ties locat­ed in the Japan­ese regions of Miyaza­ki and Kagoshima.

Expect­ed to break ground around April 2015, the project will be capa­ble of gen­er­at­ing 248 GWh of elec­tric­i­ty annu­al­ly, the equiv­a­lent of pow­er­ing 44,000 house­holds and cost an esti­mat­ed $169.67 mil­lion USD.

With a strong pres­ence through­out Japan and a robust rela­tion­ship with the local economies of Miyaza­ki and Kagoshi­ma, NES will be respon­si­ble for the project’s devel­op­ment, oper­a­tion and fuel sup­ply. Syn­er­gy Pow­er Solu­tions and Artha Ener­gy Resources will advise the transaction.

“Nip­pon Ener­gy Solu­tion is hon­ored to cre­ate a great alliance with NGPI, one of the largest ener­gy com­pa­nies in the world. We are very excit­ed about this oppor­tu­ni­ty,” said Nao­ki Yam­aguchi, Pres­i­dent of NES. “We believe it will con­tribute to a more sta­ble ener­gy sup­ply and local econ­o­my, espe­cial­ly in the for­est industry.”

The com­bined three 34.5 MW bio­mass plants pose lit­tle to no start-up risk and will use state-of-the-art mate­ri­als, which include 15,000 tons of woodchips/month from domes­tic con­trac­tors. Long-term sup­ply con­tracts with local tim­ber unions have already been secured and will sup­ply rough­ly 50 per­cent of the materials.

In addi­tion, rough­ly 10,000 tons of palm ker­nel shells (PKS) will be import­ed each month from the over­seas mar­ket. Cur­rent­ly, Indone­sia pro­duces 6 mil­lion tons, while Malaysia pro­duces 4 mil­lion tons of PKS annu­al­ly. Nego­ti­a­tions with a major heavy machin­ery com­pa­ny have already been ini­ti­at­ed. The project is also seek­ing a plant oper­a­tor for a min­i­mum of 20 years to include peri­od­i­cal maintenance.

The 20-Year Pow­er Pur­chase Agree­ment (PPA) will allow 100 per­cent of the ener­gy gen­er­at­ed by the bio­mass facil­i­ties to be pur­chased by a major PPA car­ri­er through the Feed-in Tar­iff Pro­gram (FIT). Since the renew­al of FIT in 2012, the num­ber of bio­mass facil­i­ties in Japan has grown, expand­ing renew­able ener­gy sources and reviv­ing an area dev­as­tat­ed by the country’s 2011 earth­quake and tsunami.

Togeth­er, NGPI and NES intend to increase their bio­mass pow­er plant busi­ness by more than 100MW through­out Japan in the near future. They will also be expand­ing their port­fo­lio to both solar and geot­her­mal ener­gies across the region.

“The NGPI team is very excit­ed about devel­op­ing these pres­ti­gious bio­mass projects in Japan along with NES,” said Nisha Joshi, Pres­i­dent of NGPI. “We are in the day and age where we have to use tech­nolo­gies to covert any waste or remains into ener­gy and keep the cycle going. This will not only help clean the waste from the world’s grow­ing pop­u­la­tion, but also keep up with the grow­ing ener­gy demand,” she added.

New Gen­er­a­tion Pow­er is cur­rent­ly devel­op­ing over 3000MW of hydro, solar, wind and ther­mal projects across the globe in regions through­out Africa, the Mid­dle East, Europe, South Amer­i­ca and the Unit­ed States.

The Japan 34.5 MW wood bio­mass project is expect­ed to com­mis­sioned by the Fourth Quar­ter of 2016.


Posted

in

by


EJ Communities Map

Map of Coal and Gas Facilities

We are mapping all of the existing, proposed, closed and defeated dirty energy and waste facilities in the US. We are building a network of community groups to fight the facilities and the corporations behind them.

Our Network

Watch Us on YouTube