A Resolution from ANC Regarding the DC United Consolidated PUD — 10–17-16
Community Health and Safety Study (CHASS) (70 pp; Aug 2016) — conducted by the District Department of Health to look at the overall health and economic vulnerabilities of the community
New Jersey Institute of Technology Review of the Voluntary Clean-up Plan for the DC United Stadium Site (30 pp; 5/27/2016) — gives a run down of toxins on the site and offers some recommendations
Buzzard Point Stadium Environmental Mitigation Study
(182 pp; Dec 2014)
Status Update of the D.C. United Soccer Stadium Construction — powerpoint from public meeting on 9/8/2016
Documents Related to the Toxic Site Assessment:
- 1/8/2014 Report on ASTM Phase I Environmental Site Assessment and Limited Subsurface Sampling — Akridge Parcel at Buzzard Point (847 pp)
- 9/8/2014 Report on ASTM Phase I Environmental Site Assessment and Limited Phase II Subsurface Sampling — District of Columbia Parcel at Buzzard Point (632 pp)
- July 2015 Report: Phase II Soil Investigation Report — Voluntary Cleanup Program, Potomac Electric Power Company Parcels At Buzzard Point, Square 0611, Lots 0804, 0805, And Square 0665, Lot 0024 (998 pp)
- 10/23/2013 Report on ASTM Phase I Environmental Site Assessment With Limited Phase II Subsurface Sampling, Ein Property At Square 0605, Lot 0007, 1712 2nd Street, SW, Washington, D.C. (1,326 pp)
- 6/15/2015 Phase II Soil and Groundwater Investigation Report — Voluntary Cleanup Program — Super Salvage, Inc., Parcel at Buzzard Point, Square 0605, Lot 0802, Washington, D.C. (320 pp)
- June 2015 Phase II Soil Investigation Report — Voluntary Cleanup Program — District of Columbia Parcel at Buzzard Point, Square 0603S, Lot 0800, Washington, D.C. (108 pp)
- July 2015 Phase II Soil Investigation Report — Voluntary Cleanup Program — District Of Columbia Parcel At Buzzard Point, Square 0661, Lot 0800, Washington, D.C. (457 pp)
- July 2015 Phase II Soil Investigation Report — Voluntary Cleanup Program, Rollingwood Real Estate, LLC, Parcel At Buzzard Point, Square 0605, Lot 0007, Washington, D.C. (1,927 pp)
- July 2015 Report on ASTM Phase I Environmental Site Assessment and Subsurface Sampling — Super Salvage Inc. Parcel at Buzzard Point, Square 0605, Lot 0802, Washington, DC (1,029 pp)
- July 2015 Phase II Soil Investigation Report — Voluntary Cleanup Program — SW Land Holder, LLC, Parcel at Buzzard Point, Square 0607, Lot 0013, Washington, D.C. (2,434 pp)
- July 2015 Phase II Soil Investigation Report — Voluntary Cleanup Program — Potomac Electric Power Company Parcels at Buzzard Point, Square 0611, Lots 0804, 0805, and Square 0665, Lot 0024, Washington, D.C. (998 pp)
- 8/2/2015 Cleanup Action Plan — Voluntary Cleanup Program, Buzzard Point D.C. United Soccer Stadium Development, Washington, D.C. (205 pp)
- 8/2/2015 Cleanup Action Plan — Voluntary Cleanup Program — Buzzard Point D.C. United Soccer Stadium Ancillary Development (71 pp)
- July 2015 Report on ASTM Phase I Environmental Site Assessment and Subsurface Sampling — District of Columbia Parcel at Buzzard Point, Square 0603s, Lot 0800, Washington, DC (671 pp)